色综合久久波多野结衣_亚洲色精品三区二区一区_亚洲第一福利网站在线观看_国产一区二区精品网站看黄_欧美激情一级视频_亚洲综合二区三区啪啪_久久久久成亚洲国产Av_黄片免费看、,亚洲国产精品三级av,国产人人91,精品精品精品亚洲

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗(yàn)區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

生物脫硫設(shè)備冷卻塔的安裝

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應(yīng)根據(jù)設(shè)備的各種條件,考慮其安裝位置的地面及其荷載能力,同時(shí)也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時(shí)應(yīng)注意冷卻塔的基礎(chǔ)按規(guī)定的尺寸預(yù)埋好水平鋼板,各基礎(chǔ)點(diǎn)的標(biāo)高應(yīng)在同一標(biāo)高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應(yīng)放置水平。水塔在施工安裝時(shí),為防止壓壞底盤,施工人員應(yīng)踏在底盤的加強(qiáng)筋上,在安裝塔外殼、底盤等纖維件時(shí),為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認(rèn)底盤不變形,附近干凈、干燥的條件下,為避免使用時(shí)漏水可在接觸處鋪設(shè)纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風(fēng)不良和出現(xiàn)濕空氣回流的場合,須安裝在通風(fēng)良好的場所。否則將會(huì)降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時(shí),應(yīng)根據(jù)施工圖指明的坐標(biāo)位置就位,并應(yīng)找平找正,設(shè)備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應(yīng)正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.
以上就是為大家介紹的有關(guān)生物脫硫的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://m.nittopsr.com
The above is a detailed introduction of biological desulfurization for you. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services http://m.nittopsr.com

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
午夜一区二区三区黄色| 人人看人人摸人人操1989香蕉| 另类专区亚洲综合欧美| 日韩欧美691| 国产成人在线观看视频一区| 午夜激情福利| 欧美专区亚洲乱伦| 亚洲一区二区三区乱码a蜜桃女| 91精品国产自产在线观看直播| 性色网站日本久久| 亚洲第一区在线| 国产午夜亚洲精品一区| 国产亚洲精品久久久久久无亚洲| 69黄视频| 科斗成人网| 亚州AⅤ中文Aⅴ无码Aⅴ| 欧美日韩一中文字幕| 弄逼一区| 91成人在线激情视频| 国产av一区二区精品久久凹凸 | 国产精品99亚| 亚洲网站免费看| 疯狂操逼无码| 欧美一级性生活片| 亚洲欧美日韩另类小说| 亚洲欧洲国产综合AV无码| 免费日韩性爱| www狠狠搞| 国产3级在线观看| 亚洲精品久无码久久久久国产99 | 国产成人麻豆精品午夜福利在线| 国产人在线| 欧美性爱久久视频| 996在线观看视频新地址| 无码人妻精品一区二区二秋霞影院 | 亚洲精品深夜AV无码一区二区| 亚洲国产日韩在线观看| 日韩精品在线观看3| 亚洲乱伦av| www.国产在线视频cao| 99久久精品国产免看国产一区 |